In that year there will be electric cars hanging in the streets?

When will we stop wasting money in the construction of subways ran away 10 minutes underground? (waste of time and money)

When will there tramways suspended public and private fully automated to get anywhere? And via the same networks that inter-city monorail coming?

Cost per km in millions $ CAN:
Subway: 150 M $ / km
TGV: 26 M $ / km
Monorail: 9 to 12 M $ / km
Monorail tram-: less 9 M $ / km

Whether 15 times more overhead than underground networks for the same cost and… faster!

Building an economy, maintenance and repair.
And cost sharing with the users private (particular, carrier, etc.)
And ecological! 100% electric.

When were known to every motorist pays 800 $/months for a car, we can collectively finance the transport of the future on all streets 5 years!

Imagine! To you or to a post planted at every x meters you order a car service (or private). Once inside a touch screen lets you input your destination address.

You are transported into the future? Yes, but the technology already exists to do this while! Imagine in front of home, get to your destination comfortably seated, without leading, without traffic, safely, dark red, etc. in a fraction of the time required by any other means of transport and for a fraction of the price!

On the monorail: http://www.ledevoir.com/societe/actualites-en-societe/310945/faire-quebec-montreal-a-250-km-h-suspendu-dans-les-airs

Video:

N.B. Any reproduction permitted free, provided include the following source :

Blog : http://yvesmarineau.com/blog/?p=180

This entry was posted in Editorial and tagged . Bookmark the permalink.

Leave a Reply